New Pedestrian, Utility Bridge Takes Shape on Everett Waterfront

Night pedestrian bridge in amsterdam

The bridge was designed to carry storm drainage and sewer pipelines across a steep slope.

December 16, 2019
Tim Newcomb - Engineering News-Record

Amidst the constraints of weight limits, a seawall, a waterfront restaurant and high-voltage power poles, crews from ICI Interwest Construction Inc. and heavy mover Oxbo Mega Transport Solutions positioned a $20 million, 282-ft-long pedestrian and utility bridge in place this fall along the Everett, Washington, waterfront.

Reprinted courtesy of Tim Newcomb, Engineering News-Record

ENR may be contacted at ENR.com@bnpmedia.com

Read the full story...



714.701.9180

Arrange No Cost Consultation

 

Construction Defect Journal is aggregated from a variety of news sources, article submissions, contributors, and information from industry professionals.

No content on this site should be construed as legal advice or expert opinion. By viewing this site you agree to be bound by its terms and conditions

 

Copyright 2020 - Construction Defect Journal – All Rights Reserved