The data center boom presents substantial work for the construction industry. It also brings projects in which a late component, an unresolved design change or an unavailable utility connection can have consequences far beyond the affected trade.
A data center can be finished as a building and still be months away from doing the work its owner purchased it to perform. Permanent power may be unavailable. A generator may fail an integrated test. A change in computing equipment may require a different cooling design. Each problem can delay the date on which the owner can deliver capacity to a customer, even if much of the physical construction is complete. The gap between building completion and operational readiness is where many legal disputes arise.
Artificial intelligence and cloud computing have accelerated data center development, but the pressure to deliver capacity has arrived alongside shortages of skilled workers, long equipment lead times, and constrained electric grids. For contractors, design professionals and insurers, these are familiar construction risks in an unfamiliar combination. The most consequential decisions may be made before mobilization, when the parties decide who controls each dependency and who bears the cost if it fails.
Reprinted courtesy of Mark F. Roach, Wood Smith Henning Berman and Melissa Saracyan, Wood Smith Henning Berman
Mr. Roach may be contacted at mroach@wshblaw.com
Ms. Saracyan may be contacted at msaracyan@wshblaw.com